Project Overview

Supplied and installed over 40 split-system heat pumps across multiple apartment units, focusing on energy efficiency and quiet performance.

Challenges

  1. Small balconies made outdoor unit placement and airflow optimization difficult.
  2. Required uniform wall piping routes for aesthetic consistency.
  3. Tight schedule — 3 days per floor installation timeline.
  4. Coordination with electrical and building inspection teams.
  5. Custom brackets needed for high-rise exterior walls.
  6. Accessing top-floor installations safely required temporary scaffolding.