Our Project

CityCare Hospital

blank
blank
Client

CityCare Hospital

Type

HVAC & Ventilation System

Location

Auckland, NZ

Year

2024

Project Overview

Designed and installed a hospital-grade HVAC and ventilation system to ensure clean air circulation, optimal humidity control, and patient comfort across multiple wards, operating theatres, and staff areas.

Challenges

  1. Strict air filtration standards (HEPA) and airflow zoning between sterile and non-sterile areas.
  2. Installation within operational hospital zones — required quiet, dust-free work.
  3. Integration of backup systems to maintain air circulation during power outages.
  4. Duct routing in existing ceilings with limited access.
  5. Continuous testing to maintain consistent air pressure levels.
  6. Compliance with NZ Health Facility ventilation standards.